Trello Power-Up for Gantt Scheduling
Keep Trello's flexible board workflow and add a Gantt timeline that shows sequencing, ownership, and timing.
Cards become scheduled tasks, dates stay synchronized, and progress can be updated by moving cards between lists.
Bring order to your Trello boards
Boards show work moving from stage to stage, but they do not by themselves show what must happen first, who owns each item, or whether timing is realistic. A linked Gantt view adds that missing layer without asking the team to abandon Trello.
Use the connection to:
- See multiple projects together so priorities and overlaps stay visible
- Link related tasks so handoffs are clear and work does not start before its prerequisites are ready
- Check workload by assignee and rebalance work before someone becomes overloaded
- Spot bottlenecks early and adjust dates or priorities with drag-and-drop controls
How to connect Trello and the Gantt schedule
- Add the Power-Up: Find the Gantt Power-Up in Trello's Power-Up directory and add it to your board.
- Connect your account: Sign in from Trello and authorize the connection; the Power-Up guides you through it.
- Choose how to sync: Pick Auto sync to link one board to one project, or Manual sync to send only selected cards.
Before you start, confirm you are a board Admin. If you use Safari, turn off Prevent cross-site tracking first, as setup requires it.
Auto sync or Manual sync?
Auto sync is the right choice when one board should mirror one project continuously, including new items created on either side. Manual sync is better when you want control: connect one board to several projects, several boards to one project, or several boards to several projects, with each card linked to one project at a time.
A practical decision check: if new work appears in both tools and should appear in the other automatically, use Auto sync. If you need to review and complete card details before scheduling, or you need many-to-many connections, use Manual sync.
What syncs, and what stays where it is
Names and start and end dates sync between Trello and the Gantt schedule. Dependencies, assignments, and percent complete are managed in the Gantt tool and shown on the linked Trello card. Checklists, attachments, and comments stay in Trello, and Trello lists do not sync to Gantt groups.
For progress, assign a Percent Complete value to a Trello list in Power-Up settings. Set Done to 100% so dragging a card into Done marks its task complete. Turn on Automatically Move Card to work in reverse: when a task reaches a list's percentage, its card moves to that list.
Existing Trello cards sync into the Gantt schedule when you turn on the Power-Up. Existing Gantt tasks do not appear in Trello automatically; with Auto sync, duplicate those tasks in the Gantt tool and delete the originals so the copies create matching cards.
Teammate access
Access is handled individually rather than shared automatically through the board. First bring each teammate into the relevant Gantt project. Then, on the Trello board, every teammate installs the Power-Up separately and authenticates using the account associated with that project. After that personal connection step, the Gantt view is available to them in Trello.
Supercharge Trello with Gantt Scheduling
Add dependencies and dates to the Gantt schedule while your team continues working in Trello. To begin, install the Trello Power-Up from the Trello Power-Up directory.
| Auto sync | Manual sync | |
|---|---|---|
| Connection | One board to one project | One board to several projects, several boards to one project, or several boards to several projects |
| New items | Both ways: new cards become tasks and new tasks become cards | One way, from Trello to the Gantt schedule |
| Best for | Continuous mirroring of a single board and project | Reviewing cards before scheduling and flexible connections |
Each card links to one project at a time.
Frequently asked questions
Does Trello have a Gantt chart?
No. Trello's Timeline view on Premium and Enterprise plans arranges cards by date, but it does not provide built-in task dependencies. Adding the Power-Up links a board to a Gantt chart that adds dependencies, assignments, and progress tracking.
How do I set up the Power-Up for Trello?
Add the Power-Up from your board's Power-Ups menu, sign in or create an account, and authorize the connection. Then choose Auto sync for one board paired with one project, or Manual sync to select cards yourself. You must be a board Admin, and in Safari you should first turn off Prevent cross-site tracking.
Does the Power-Up sync both ways?
Auto sync creates items in both directions: a new Trello card becomes a Gantt task, and a new Gantt task becomes a Trello card. Manual sync is one-way, from Trello into the Gantt schedule, so you can finish card details before sending them to the schedule.
Can I sync more than one Trello board or Gantt project?
Manual sync allows broader pairings: a single board may feed multiple projects, multiple boards may feed a single project, or both sides may involve several items. A given card still belongs to only one project at a time. Auto sync remains a strict one-to-one pairing between a board and a project.
What syncs between Trello and the Gantt schedule?
Task names and start and end dates sync between the two tools. Dependencies, assignments, and percent complete are managed in the Gantt tool and displayed on the linked Trello card. Checklists, attachments, and comments remain in Trello, and Trello lists do not sync to Gantt groups.
Can moving a Trello card update progress in the Gantt schedule?
Yes. In Power-Up settings, assign a Percent Complete value to a Trello list. Setting Done to 100% means dragging a card into Done marks its Gantt task complete. With Automatically Move Card turned on, the reverse also works: when a task reaches a list's percentage, its card moves to that list.
Will my existing Trello cards and Gantt tasks sync?
Existing Trello cards sync into the Gantt schedule when you turn on the Power-Up. Existing Gantt tasks do not appear in Trello automatically. With Auto sync, duplicate the tasks in the Gantt tool and delete the originals; the copies count as new tasks and create matching cards on your board.
Can my teammates see the Gantt chart in Trello?
Yes, after each person connects. Setup is per user, so adding the Power-Up to a board does not give everyone access. Invite teammates to your Gantt project, then have each person add the Power-Up on the board and sign in with the same login used for that project.