How to Use Gantt Charts with Trello
A Trello board shows work moving through stages, while a Gantt chart shows that same work spread across time. Used together, they answer two different questions: what is happening now, and when must each part finish. This guide explains how to connect the two views, keep them in step, and use each one for the conversations it suits best.
Trello and Gantt charts solve different problems
Trello suits teams that need a clear picture of current flow: which cards are waiting, which are underway, and which are finished. It works well for software development, frequent app or website releases, work with few outside dependencies, process improvement, and waste reduction. Lists such as To Do, Doing, and Done make blockers and handoffs easy to spot day to day.
A Gantt chart adds the time dimension. Bars, dates, milestones, and dependency lines show sequence and duration at a glance. That view becomes valuable when deadlines cannot move, stakeholders do not use Kanban boards, teams are overloaded, or several teams and dependencies are involved. Trello alone can make those relationships hard to see; a timeline makes trade-offs and knock-on effects easier to discuss.
Decision checklist: add a timeline when time and dependencies matter
Use this checklist to decide whether the pairing fits your project:
- Deadlines are fixed, or a late deliverable would affect other teams
- Stakeholders need a high-level timeline rather than a board
- Work is complex, cross-team, or dependency-heavy
- You need to show workload, resource pressure, or prioritization choices
- Your team still benefits from a board for daily focus and blocker tracking
If none of those apply and work is simple, fast-moving, and lightly dependent, a board alone may be enough. The gain from adding a timeline grows with complexity and time pressure.
Connect the board in four steps
Open the board you want to sync, choose Power-Ups in the main menu, search for the Gantt Power-Up, and select Add. Authorize the connection, then sign in or create an account. Next, choose the destination Gantt chart and decide how the platforms should sync. Starting with automatic sync is recommended for a straightforward one-to-one setup.
Safari note: if authorization does not complete, uncheck Prevent cross-site tracking in Safari Privacy preferences. Without that change, Safari can block the cookies needed to save the authorization.
Automatic sync or manual sync
Automatic sync keeps card updates and Gantt progress aligned in both directions. Manual sync gives you control over timing. Manual mode is the better fit when multiple Trello boards connect to one Gantt chart, or one board connects to several charts, because you need to trigger each sync deliberately rather than letting every change flow through at once.
Map list moves to percent complete, in both directions
To let Trello list moves update Gantt progress, open the Power-Up, choose Edit Power-Up settings, and scroll to List Percent Complete Settings. Assign a percentage to each list. A practical example is To Do at 0%, Doing at 5%, and Done at 100%: when a card moves into Doing, its linked task updates to 5% complete, and when it reaches Done, it updates to 100%.
For the reverse direction, choose a Percent Complete threshold and tick Automatically Move Card. For example, a task reaching 100% in the Gantt chart can move its Trello card to Done. Set the thresholds per list so the board reflects the same definition of progress as the timeline.
View and edit the timeline from Trello
From Trello, use the View in Gantt chart button at the top right, select a project, and choose View in Gantt chart. There you can edit the timeline, add tasks, and build new views of the work. Useful customizations include adding start and end dates, inviting collaborators, adding dependencies, updating in-progress task status, viewing tasks in list or calendar form, and adding locked milestones where needed.
Dependencies deserve early attention: linking the end of one task to the start of another shows which delays will cascade. That single visual often changes a stakeholder conversation from abstract concern to a concrete priority decision.
Use each view for the conversation it fits
Share the chart early, in the form each audience needs. Invite collaborators who should comment, upload files, and update progress. Export a PDF for status meetings or email updates. Share a view-only link so stakeholders can check progress without waiting for a manual update.
Adjust the view to the meeting. A portfolio or multi-project timeline, with groups minimized, suits a big-picture review; expanded groups suit detailed planning. For a first stakeholder review, cover the main work buckets, whether the project is on track, anticipated roadblocks, and how stakeholders can access the chart later. The Workloads tab can also surface overload across one project or across all projects.
Use both tools regularly, but for different jobs. The board keeps the team focused and exposes blockers daily. The timeline keeps dates, scheduling, and trade-offs visible. Checking both several times a week is normal, especially as the project moves through its lifecycle.
Troubleshooting
If a Trello list does not sync, or a card does not show the expected Gantt task details, follow the Power-Up troubleshooting guide for those common issues. If the guide does not cover your situation, reach out to the support team and ask about current response times and availability before you rely on a particular turnaround for a deadline.
Frequently asked questions
How do I connect a Trello board to a Gantt chart?
Open the board, choose Power-Ups from the main menu, search for the Gantt Power-Up, add it, authorize the connection, sign in or create an account, then pick a destination chart and a sync mode. Automatic sync is a sensible starting point for a single board linked to a single chart.
How does list progress update Gantt tasks?
In Power-Up settings, open Edit Power-Up settings, scroll to List Percent Complete Settings, assign a percentage to each list, and, if you want the reverse direction, tick Automatically Move Card for the relevant lists. For example, To Do can be 0%, Doing 5%, and Done 100%.
When should I use manual instead of automatic sync?
Use automatic sync when one board maps cleanly to one chart and you want card moves and progress changes reflected without manual action. Use manual sync when several boards feed one chart, or one board feeds several charts, so you can decide when each update is pushed.
Why might authorization or syncing fail in Safari?
If Safari is blocking authorization, uncheck Prevent cross-site tracking in Safari Privacy preferences so the cookies needed for authorization can be saved. If a list or card still does not display as expected, check the troubleshooting guide for the Power-Up.