Plan, track and share projects from one live schedule
This guide explains how scheduling, workload, time, cost and collaboration work together so a team can move from a rough idea to a monitored plan without maintaining separate copies.
Build a schedule that reacts to change
A useful schedule starts with tasks placed on a visual timeline. Dragging a bar changes its dates, and linked work moves with it when dependencies are set. Lead and lag settings let one task overlap another or wait a defined amount, while milestones mark decisive dates. Critical-path highlighting separates the chain that controls the finish date from work that can move without affecting it. Baselines preserve the original dates so later slippage is visible rather than absorbed silently.
Checklist before you trust the plan: confirm every predecessor, set lead or lag where work genuinely overlaps, mark milestones, save a baseline, then test a one-day slip to see whether the finish date changes.
Use one plan in the format each person needs
The same tasks can be read as a Gantt chart, calendar, list or board, so planners, managers and delivery teams do not need separate status documents. Subtasks, checklists, labels, assignments and RACI ownership keep detail inside the task. Comments, sticky notes and files stay beside the work they explain, and an activity log records changes.
Example from the captured illustrations: moving a plumbing task also shifts its dependent electrical task, while a comment thread and copied live link keep discussion and sharing attached to that chart.
Balance people, time and money against the dates
Assignments can cover individuals, teams, equipment and spaces. A global workload view aggregates demand across active projects by task count or estimated hours, updating as the timeline changes. That distinction matters: a person may look free on one project while already overloaded across the portfolio.
Time tracking and timesheet reports compare estimated and actual hours. Cost-loaded scheduling adds budgeted and actual cost per task, monthly project totals and cash-flow forecasts that move with the schedule. A health report then summarises what is on time and what is behind.
Construction coordination and connections
For construction work, lookahead schedules focus on imminent work, procurement tracking connects material orders to installation tasks, and subcontractors can confirm by text or email without signing in. Clients can follow progress through view-only links or a portal. Procore synchronisation is one-way from this platform to Procore, so do not assume changes flow back automatically.
Other connections include Slack, Trello, Zapier, Basecamp 2, Dropbox, Google/iCal/Outlook calendar feeds, Microsoft Project import and export, and an open API. Imports from Microsoft Project, Excel CSV and Primavera P6 are supported; P6 resources and assignments must be reapplied after import.
Start with an AI draft, then verify the logic
Describe the project and the assistant can draft phases, tasks, milestones and durations as a starting point. The newer beta version can also answer questions about overdue work and apply schedule changes, such as pushing remaining tasks after a weather delay. Treat the generated draft as a plan to review, not a substitute for checking dependencies, resources and dates.
Before starting, decide which view the team will use daily, who owns each task, which milestones matter, and how progress will be reported to clients. Those choices determine whether the live schedule replaces scattered updates.
Workflows, controls and sharing options
Beyond the core timeline, several controls shape how the plan is run day to day. Custom workflows let you build cross-project boards that follow your own process rather than a fixed template. Real-time progress shows where each task stands as work advances, and project filters plus show/hide columns let you narrow the view to the details that matter for a given review. Custom fields add team-specific details to tasks and projects, while global search finds projects, tasks, reports and settings quickly.
For capacity, hourly estimation helps improve allocation and surface overages early, and a workloads report tracks how resources are being used across active projects. Notifications and alerts keep people informed of changes automatically, user management controls access and permissions, and single sign-on gives the team one secure way to sign in. Mobile access and support for Mac and PC mean the plan can be checked from any device.
For sharing and records, project exports download plans in multiple formats, print timeline PDFs produce clean copies to share or archive, and embed timelines display a Gantt chart directly on your own site.
| Need | Use this | What to check |
|---|---|---|
| Protect the finish date | Critical path and baselines | Whether a slip moves the finish |
| Prevent overload | Global workloads | Demand across all projects, not one project |
| Control cost | Cost-loaded scheduling and health report | Budgeted versus actual cost and forecast |
| Coordinate outside the team | Share links, portal and subcontractor confirmation | No-login access and one-way Procore sync direction |
| Move an existing plan | Microsoft Project, Excel CSV and Primavera P6 import | P6 assignments must be reapplied |
This comparison reflects the feature descriptions above. Which items are available, and on what terms, can differ by plan, so verify the current plan and pricing details with the provider before deciding.
| Area | Feature | Purpose |
|---|---|---|
| Process | Custom workflows | Build cross-project boards that match your process |
| Progress | Real-time progress | See where tasks stand as work progresses |
| Capacity | Hourly estimation | Improve allocation and spot overages early |
| Capacity | Workloads report | Track resource utilization across active projects |
| View | Project filters | Focus on the work that matters |
| View | Show/hide columns | Customize the project details displayed |
| View | Custom fields | Track project details that matter to your team |
| Alerts | Notifications & alerts | Automatic updates and alerts |
| Access | User management | Control access and permissions |
| Access | Single sign-on (SSO) | One simple, secure way to sign in |
| Sharing | Project exports | Download plans in multiple formats |
| Sharing | Print timeline PDFs | Share or archive schedules as clean PDFs |
| Sharing | Embed timelines | Display Gantt charts on your site |
| Finding | Global search | Find projects, tasks, reports and settings fast |
| Devices | Mobile access | Manage projects from any device |
| Devices | Works on Mac & PC | Access projects from any computer |
Feature names and purposes are taken from the captured source; none of the features in this table is marked Builder-only in the source.
Frequently asked questions
What features are included?
Everything centres on a single live timeline. You can build it with drag-and-drop scheduling, linked tasks using lead and lag, milestones and reusable templates. Work is broken down with subtasks and checklists, then viewed as a Gantt chart, calendar, list or board, alongside a personal task view and portfolio dashboard. Workload, time, comments, files and sharing all draw from that same timeline, keeping one shared version.
Are there features for construction teams?
Yes. Construction-focused tools include lookahead schedules, procurement tracking and subcontractor confirmation on a shared office-and-field timeline. Material lead-time tracking connects orders to installation work, so a slipped delivery moves the linked dates. A client portal and Procore connection also use that timeline, with one-way synchronisation from this platform to Procore.
Can clients or subcontractors see the schedule without an account?
Yes. Subcontractors can receive confirmation requests by text, email or both, and respond on a simple page without signing in. Clients and other stakeholders can use view-only share links or a client portal to see progress as it happens, reducing the need to chase updates or send static PDFs.
Does it show the critical path?
Yes. Selecting the critical-path option highlights the tasks that determine the finish date; other work dims or can be filtered out. If a task slips, you can immediately see whether the finish date moves. Baselines allow planned dates to be compared with actual progress.
Does it include resource management?
Yes. Work can be assigned to people, teams or assets such as equipment and spaces. Global workloads show demand across all projects by tasks or estimated hours and refresh as tasks are dragged. That makes overloads and double-booking easier to spot before they happen.
Can it track time and budgets?
Yes. Hours and spending stay connected to the timeline itself. Record time, review timesheets, and set planned hours beside the hours actually used. For money, each task can carry a budget figure and a spent figure, rolled up by month for a single project and for all active projects together. As dates move, the cash-flow outlook moves too, while a health summary flags work that is on schedule or slipping.
What does it integrate with?
Connections include Procore with automatic one-way sync from this platform to Procore; Slack through a direct app without Zapier; Trello through a Power-Up; Zapier for wider app connections; Basecamp 2 and Dropbox; calendar feeds for Google, iCal and Outlook; Microsoft Project import and export; and an open API for custom connections.
Can I import from Microsoft Project, Excel or Primavera P6?
Yes. Microsoft Project (.mpp) files, CSV files from Excel or other spreadsheets, and Primavera P6 schedules can be imported. P6 imports carry task names, dependencies, dates and percent complete, but resources and assignments do not carry over, so people need to be assigned after import.
Does it have an AI assistant?
Yes. The AI assistant can create a starting plan from a project description, including phases, tasks, milestones and durations. A newer beta version also supports managing the plan: ask about overdue work, adjust for a change order, or push remaining tasks back after a weather delay, and the assistant applies the updates.
Can I try it before buying?
A trial is the practical way to test whether the schedule, workload and cost views fit how your team already works. Before relying on any offer, check the current trial length, which features each plan includes, and the price terms directly with the provider. Treat any specific duration or plan detail as unconfirmed until you have that information in writing.