Resource management software for balanced team workloads

A single cross-project view shows who is busy, who has room, and where work can move before a deadline slips or a teammate is overloaded.

See overload across every project, not one project at a time

Overload usually hides between projects. One person may look manageable in each separate plan while carrying too much in total. A combined workload view solves that blind spot by placing every assignment for a person on one timeline, grouped by day or week.

Use the heatmap as a daily check: scan for the darkest or flagged cells, open the overloaded day to see which tasks are stacked there, then decide whether to move, split or reschedule work. Because the view is built from task dates, a change on the chart is reflected in capacity straight away.

Rebalance with drag and drop, then verify both sides

When a day is overbooked, drag the task to a teammate who has capacity. Both people's workloads update instantly, so you can see the effect of the move before you commit to it.

A practical rebalancing sequence:

  • Identify the overloaded person and the specific day or week causing the pressure.
  • Check who has open capacity in that window, not just who is generally less busy.
  • Move one task at a time and watch both workloads update.
  • Re-check the receiving person's following days so the problem does not simply shift forward.

This works for individuals, teams and assets alike, because assignments can be made to any of those three.

Plan around real hours and learn from actuals

Task counts alone can mislead: five short tasks may be lighter than one task that needs a full day. Adding an hourly estimate to each task lets you judge what a team can realistically take on before a deadline is promised.

After work is done, log actual hours and compare them with the estimate. That comparison is the learning loop: if a type of task consistently runs over, the next estimate for similar work should start higher. Over time, plans move closer to how long work actually takes.



Schedule equipment and spaces like people

Equipment and spaces create the same conflicts as people. A scissor lift booked by two crews on the same day, or a room reserved twice, will not show up in a people-only view.

Book equipment and spaces alongside the crew so usage and conflicts are visible in the same place. Treat an asset exactly like a person in the workload view: assign it to tasks, check its load by day, and move a booking when a clash appears.

Keep everyone on the same live plan

Workload balance is easier when everyone works from the same live plan. Teams, clients and subcontractors can all see the current schedule, which reduces the chance that a handoff is based on an outdated copy.

Custom fields let you adapt the view to how your work is organised, and you can choose to plan in hours or in tasks, by day or by week. For construction work, the same approach keeps crews, materials and handoffs aligned as job schedules change, with material orders tied to scheduled install tasks and subcontractor sign-off collected by email or text without a login.

Supporting features for monitoring and coordination

Beyond the core workload view, supporting features help you monitor and act on capacity:

  • Global workloads and a workloads report show demand and utilisation across active projects.
  • A portfolio dashboard tracks status across every project in one view, with project filters to focus on the work that matters.
  • Notifications and alerts keep you informed of changes automatically.
  • Task assignments and a RACI chart clarify who owns what.
  • Time tracking and timesheet reports let you log and review time inside the plan.
  • Cost-loaded scheduling compares costs, tracks budgets and forecasts cash flow.
  • Procurement tracking keeps materials in view across active projects.
  • User management controls access and permissions, and single sign-on gives the team one secure way to sign in.
  • Zapier integration and a custom API connect the plan to existing tools and automate project updates.
Decision checklist: from workload signal to action
Planning questionWhat to look atAction it supports
Who is overloaded this week?Workload heatmap by day or week across all projectsMove or split a task before burnout or a missed deadline
Is a piece of equipment double-booked?Asset and equipment labels in the workload viewRebook the asset on an open day
Can we commit to this deadline?Hourly estimates per task against available capacityAccept, renegotiate or re-sequence the work
Did estimates match reality?Logged actual hours compared with estimatesAdjust future estimates for similar tasks

Workload views are derived from task dates and assignments; hourly estimates and logged actuals add a second, time-based lens.

Frequently asked questions

Do I need to maintain a separate spreadsheet to know who is free?

No. Capacity is derived from the dates already on your tasks, so moving a task or changing its dates changes the workload picture without a separate spreadsheet tally.

Can equipment and spaces be scheduled the same way as people?

Yes. People, equipment and spaces can all be assigned to work and shown in the same workload view, which makes a double-booked item visible alongside a double-booked person.

Can I plan by hours instead of just by task count?

Yes. You can plan in hours or in tasks, and look at the load by day or by week. Hourly estimates can be added per task, and logged actual hours can then be compared with those estimates.