Basecamp 2 to Gantt chart integration

Keep daily work in Basecamp 2 while planning dates, owners, and dependencies on a visual timeline.

This integration turns to-dos and calendar events into Gantt tasks, then keeps both sides updated as work changes.

Why add a timeline to Basecamp 2 work

Basecamp 2 is good at keeping to-dos and conversations in one place, but it does not show when work happens or how one person's load compares with another's. A Gantt view fills that gap: each to-do becomes a bar on a timeline, so you can see sequencing, deadlines, and capacity at a glance while your team continues working in Basecamp 2.

Before you connect: a readiness checklist

Use this checklist before you connect:

  • Confirm you are using Basecamp 2 — other Basecamp versions are not supported.
  • Decide whether to sync to-dos, calendar events, or both for each project.
  • Plan to import every Basecamp 2 user, since each one needs a Gantt tool account and will be invited by email.
  • Note the sync limits: only the first assignee on a task carries over, and documents and files do not sync.
  • If a project already exists in the Gantt tool, prepare to create a fresh Basecamp project and move groups into it rather than syncing the existing project directly.

Planning on the chart

Once connected, you can arrange to-dos by dragging them into place on the chart. Dependencies, baselines, and resource management can be layered on as the plan takes shape, without requiring training for the team. A practical example: a two-week launch list in Basecamp 2 becomes a dated timeline where you can spot that three tasks assigned to one person overlap, then spread them out before committing to a date.



Keeping both tools in step

The two tools stay aligned in both directions. Editing a task in the Gantt tool — adding, removing, or moving it — updates the matching to-do in Basecamp 2. Creating a new to-do in Basecamp 2 brings it into the Gantt tool automatically. This means the schedule you adjust on the timeline is the same work your team sees in their to-do lists.

Workloads, time, and reporting

A workload view shows what each person is assigned on any given day. That makes it easier to set realistic dates and to notice overload early, while there is still time to reassign work or bring in help. Time tracking can also sit alongside tasks, so consultants, agencies, and in-house teams can log hours without switching to a separate timesheet routine.

How to connect Basecamp 2

Step 1 — Link your account: open Account Settings, then Integrations, link your Basecamp projects, and grant the Gantt tool access to Basecamp 2. Step 2 — Pick your projects: under Manage Basecamp Projects, choose which projects to sync and whether to include to-dos, calendar events, or both. Step 3 — Import your schedule: select Import Project. Your to-dos appear on the Gantt chart, and Basecamp 2 users receive invitations to the Gantt tool.

Bring Gantt charts to your Basecamp 2 projects

Your team keeps working in Basecamp 2, and you get the full schedule in one visual place. Start by linking your account, selecting your projects, and importing — then use the timeline to sequence work, balance workloads, and keep both tools updated as plans change.



Frequently asked questions

Which Basecamp version works with this integration?

Only Basecamp 2 is supported. Connections to Basecamp Classic, Basecamp 3, and later versions are not available through this integration.

What syncs between Basecamp 2 and the Gantt tool?

To-dos and calendar events become tasks on the Gantt chart. Changes made to a task in the Gantt tool — adding, removing, or rescheduling it — update the matching to-do in Basecamp 2, and newly created Basecamp 2 to-dos appear automatically. Because Basecamp 2 allows one person per to-do, only the first assignee on a task is carried across. Documents and files are not synced.

Do Basecamp users need accounts in the Gantt tool as well?

Yes. Import all of your Basecamp 2 users during setup so the sync works properly. Each user receives an email invitation to the Gantt tool automatically.

Can I sync a project I have already built in the Gantt tool to Basecamp?

Yes, with an extra step. First create a new project in Basecamp and sync it with the Gantt tool. Then open both the original project and the newly synced project in the Gantt tool and move the groups from the original into the synced one, so the groups and tasks carry over correctly.