Project scheduling software
A live visual timeline helps you finish on time when plans change.
Drag tasks to new dates, let dependent work move with them, and keep everyone looking at the same current plan instead of a static copy.
A five-step way to build a schedule you can actually follow
Start in one of three ways: reuse a template, import an existing plan, or describe the project and have an AI assistant draft the first version. Then sequence the work. Link tasks that depend on each other and add lead or lag time where overlap or waiting is realistic — for example, a finish-to-start link with a two-day lag. Finally, highlight the critical path and add milestones so the finish date and its drivers are visible at a glance. A kitchen remodel draft, a two-day lag, and a final inspection milestone illustrate each step without needing a blank chart.
Track drift and share the current plan, not a snapshot
Save a baseline when work kicks off. Later, compare the live plan with that baseline to see how far each task has drifted, in days. Share a live link rather than a file copy, so clients and subcontractors always open the current dates. This distinction matters: a baseline explains change, while a live link prevents people working from old dates.
Why a schedule-first view helps day-to-day work
The chart itself is the plan, so there is no separate version to reconcile. Team members can read and update tasks without a walkthrough. Add custom fields and switch between Gantt, list, board and calendar views to suit different meetings. Keep comments, files and decisions tied to the relevant task, and check workloads so the right people are free when work starts.
Construction scheduling: crews, materials and handoffs
For construction work, keep crews, materials and handoffs aligned as dates change. Lookahead views focus on upcoming work, material lead times can be tied to install tasks, and cost-loaded scheduling can compare costs, track budgets and forecast cash flow where those capabilities are available. Subcontractor coordination and syncing with construction tools support the same shared schedule.
Structure, workloads, exports and connections
Break larger work into task groups and subtasks, use global workload views across projects, manage equipment and spaces alongside people, and export plans in multiple formats. Connect schedule data to existing tools through integrations or a custom API so updates do not need to be re-entered elsewhere.
Decision checklist: does this scheduling tool fit your work?
Use this checklist before committing to a scheduling tool: 1) Can you start from a template, import, or AI draft? 2) Do dependencies and lead/lag move downstream dates automatically? 3) Can you highlight the critical path and milestones? 4) Can you save a baseline and measure drift? 5) Can external partners view a live link without working from old dates? 6) Can you switch views and add custom fields? 7) Are construction, cost, material and integration needs covered for your type of project? Before relying on any trial, demo, or plan terms, confirm the current offer, limits, and pricing directly with the provider.
| Capability | What it does | Use it when |
|---|---|---|
| Visual timelines | Shows every task on a Gantt chart | You need a shared, at-a-glance plan |
| Drag-and-drop scheduling | Adjust timelines and reorder tasks instantly | Dates change frequently |
| Task dependencies | Keeps linked tasks moving together | Work must happen in sequence |
| Custom lead/lag time | Controls overlap and delays precisely | Tasks need breathing room or waiting time |
| Critical path analysis | Highlights tasks that drive completion | You must protect the finish date |
| Milestone tracking | Marks key dates and progress toward goals | You need decision or inspection points |
| Lookahead schedules | Focuses on upcoming short-term work | You plan in weekly or near-term windows |
| Public share links | Shares live schedules with clients and subs | External partners need current dates |
Feature descriptions paraphrased from source feature list; Builder-marked items need owner confirmation of availability.
Frequently asked questions
How do I start a schedule without building it from scratch?
Begin with a saved template, bring in an existing file from another tool, or describe the work and let an AI assistant draft an initial plan you can then edit. The kitchen remodel example shows how a draft can be turned into sequenced tasks rather than starting from an empty chart.
What happens when a task date moves?
Link tasks so a change to one date carries through to later work. Add lead or lag time where a task should overlap its predecessor or wait before starting — for example, a two-day lag after a predecessor finishes.
How do I know which tasks drive the finish date?
Highlight the critical path to see the chain that determines the finish date, and mark milestones for key dates such as a final inspection. Tasks on that chain are the ones that cannot slip without moving completion.
How do I measure change against the original plan?
Save a baseline at kickoff, then compare current dates against it to see drift in days for each task. That makes it easier to explain what changed, when, and what it affects.
How do external partners stay on current dates?
Share a live link that always reflects the current schedule, so clients and subcontractors are not working from outdated dates. Subcontractor sign-off can also be collected by email or text without requiring a login, where that capability is available.