Skip to content
GanttPal
Log in Get started

Construction project management features

Keep job schedules, crews, equipment and subcontractor commitments in one shared plan, so delays are visible early enough to act on them.

Build and adjust the job schedule

Start with a visual job schedule that can be built quickly and adjusted by dragging tasks when plans change. Linked dependencies move automatically, so shifting one activity does not require rebuilding the whole sequence. Break each job into assignable tasks with clear owners, due dates and next steps.

See crews and equipment across jobs

View every crew and piece of equipment committed across all jobs in one place. This makes double-bookings and idle capacity easier to spot before they affect dates. Equipment can sit alongside people as a resource, and a portfolio view helps compare demand and status across projects.

Track progress and protect the critical path

Use milestones, critical path highlighting, baselines and short-term lookaheads to distinguish work that drives completion from work with flexibility. Compare planned dates and progress with actuals, and use custom lead and lag settings to control overlap and delays between tasks.



Connect materials, procurement and cost

Tie material orders to scheduled install tasks so order-by dates reflect when work actually needs supplies. Procurement tracking keeps materials visible across active projects. Cost-loaded scheduling can also compare costs, track budgets and forecast cash flow where that capability is enabled.

Keep office, field, subs and clients aligned

Office, field, subcontractors and clients can work from the same schedule instead of chasing updates by phone and text. Subcontractors can confirm dates by email or text without logging in, clients can check live schedules and status through shared links or a portal, and field teams can update tasks and upload photos from mobile. Comments, files and custom workflows keep discussion and documents in project context. Procore integration syncs construction schedules and updates with Procore.

A quick adoption checklist

A practical check before adopting the platform: import an existing schedule if available, assign crews after import, confirm how subcontractors will receive and confirm dates, decide which milestones and lookahead window the field will use weekly, and verify which financial or document-control tasks will remain in separate systems. This separates scheduling value from invoicing, RFIs and submittals, which are outside the stated scope.

Construction scheduling decision map
NeedWhat to look forWhy it matters
Schedule changesDrag-and-drop tasks with automatic dependency shiftsOne delay does not force a full rebuild
Crew conflictsWorkload heatmap across jobs, with equipment as resourcesReveals double-bookings and open windows
Slipping workCritical path, milestones, baselines and lookaheadsShows which tasks drive completion
Material timingLead-time tracking tied to install tasksAligns order-by dates with field work
Procore syncProcore integration to sync construction schedules and updatesKeeps connected systems aligned
Outside scopeNo invoicing, RFIs or submittalsKeep financial and document-control tools separate

Feature summary based on the supplied product overview; confirm current plan availability before purchase.

Frequently asked questions

What features are included for construction teams?

Drag-and-drop Gantt charts with dependencies, critical path, baselines and 2–6 week lookaheads form the core. A workload heatmap shows crews and equipment together, material lead times tie order-by dates to install tasks, subcontractors confirm dates by email or text, clients check progress through a portal, and field teams update tasks and upload photos from mobile.

Which feature helps manage crews and equipment across multiple jobs?

Resource management shows a workload heatmap for every crew across every job. Equipment can be added as labels, such as a skid steer or crane, alongside people. A quick scan can reveal a crew booked on two jobs in the same week and open windows for the next assignment.

How do subcontractors and clients see the schedule?

Subcontractors can view their dates and confirm by email or text without a login. Clients can check schedule, messages, photos and updates through a client portal on their own time. Whether user seats are capped or unlimited depends on the plan you choose, so confirm the current user terms for the construction edition before you commit.

Does it handle invoicing, RFIs, or submittals?

No. This is a schedule-focused tool, so it does not include invoicing, pay applications, AIA forms, schedule of values, RFIs, submittals, a dedicated daily log module, or native QuickBooks integration. Existing estimating, financial or document-control software can remain in place alongside it.

Can I import an existing schedule from P6, Microsoft Project, or Excel?

Yes. Imports are supported from Primavera P6, Microsoft Project (.MPP), and CSV files including Excel-saved files. P6 and Microsoft Project imports bring task names, dependencies, start and end dates, and percent complete. Resource assignments do not carry over, so crews need to be assigned after import.